STRATEGI PEMILIHAN SUBCONTRACTOR UNTUK MENINGKATKAN KINERJA BISNIS PADA INDUSTRI KONSTRUKSI
DOI:
https://doi.org/10.29040/jap.v24i1.8329Abstract
References
Butt, A. S. (2020). Mitigating knowledge hiding in a buyer-supplier relationship: An exploratory study. Knowledge and Process Management, 27(3), 187–196. https://doi.org/10.1002/kpm.1626
Creasy, T., & Fan, Y. (2017). Who They Know and What They Know: Risk Management Implications of Subcontractors’ Interfirm Alliances and Service Scope. Drake Management Review, 6(2), 1–20. http://faculty.cbpa.drake.edu/dmr/0612/DMR061201R.pdf
Creswell, J. W., & Creswell, J. W. (2007). Qualitative inquiry & research design : choosing among five approaches. Sage Publications.
Eom, C. S. J., Yun, S. H., & Paek, J. H. (2008). Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), 842–851. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(842)
Errasti, A., Beach, R., Oyarbide, A., & Santos, J. (2007). A process for developing partnerships with subcontractors in the construction industry: An empirical study. International Journal of Project Management, 25(3), 250–256. https://doi.org/10.1016/j.ijproman.2006.10.002
Gill, P., Stewart, K., Treasure, E., & Chadwick, B. (2008). Methods of data collection in qualitative research: Interviews and focus groups. British Dental Journal, 204(6), 291–295. https://doi.org/10.1038/bdj.2008.192
Graue, C. (2015). Qualitative data analysis. International Journal of Sales, Retailing & Marketing. 4(9), 5–14.
Heide, J. B., & John, G. (1990). Alliances in Industrial Purchasing: The Determinants of Joint Action in Buyer-Supplier Relationships.
Heirati, N., Henneberg, S. C., Richter, A., & Harste, R. (2019). Differential importance of social and economic determinants of relationship performance in professional services. Industrial Marketing Management, 76, 23–35. https://doi.org/10.1016/j.indmarman.2018.07.009
https://www.investopedia.com/ask/answers/032415/whats-difference-between-outsourcing-and-subcontracting.asp. (n.d.). Is Outsourcing the Same as Subcontracting? https://www.investopedia.com/ask/answers/032415/whats-difference-between-outsourcing-and-subcontracting.asp
Hugos, M. (n.d.). ESSENTIALS of Supply Chain Management. www.wiley.com.
Hussain, M., Khan, M., & Al-Aomar, R. (2016). A framework for supply chain sustainability in service industry with Confirmatory Factor Analysis. In Renewable and Sustainable Energy Reviews (Vol. 55, pp. 1301–1312). Elsevier Ltd. https://doi.org/10.1016/j.rser.2015.07.097
Jääskeläinen, A. (2021). The relational outcomes of performance management in buyer-supplier relationships. International Journal of Production Economics, 232. https://doi.org/10.1016/j.ijpe.2020.107933
Kale, S., & Arditi, D. (2010). Construction Management and Economics General contractors’ relationships with subcontractors: A strategic asset General contractors’ relationships with subcontractors: a strategic asset. June 2015, 37–41. https://doi.org/10.1080/01446193.2001.9709630
Kramer, R. M. (2006). Organizational Trust: A Reader. Oxford University Press.
Lehtinen, U. (1999). Subcontractors in a partnership environment: a study on changing manufacturing strategy. International Journal of Production Economics, 60, 165–170. https://doi.org/10.1016/S0925-5273(98)00154-6
Liu, J., Yang, P., Xia, B., & Skitmore, M. (2017). Effect of Perceived Justice on Subcontractor Willingness to Cooperate: The Mediating Role of Relationship Value. Journal of Construction Engineering and Management, 143(9), 04017062. https://doi.org/10.1061/(asce)co.1943-7862.0001350
Manu, E., Ankrah, N., Chinyio, E., & Proverbs, D. (2015). Trust influencing factors in main contractor and subcontractor relationships during projects. International Journal of Project Management, 33(7), 1495–1508. https://doi.org/10.1016/j.ijproman.2015.06.006
Mentzer, J. T., DeWitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., & Zacharia, Z. G. (2001). Defining supply chain management. Journal of Business logistics. Journal of Business Logistics, 22(2), 1–25.
Morgan, N. A. (2012). Marketing and business performance. Journal of the Academy of Marketing Science, 40(1), 102–119. https://doi.org/10.1007/s11747-011-0279-9
Morgan, R. M., & Hunt, S. D. (1994). The Commitment-Trust Theory of Relationship Marketing.
Neubauer, B. E., Witkop, C. T., & Varpio, L. (2019). How phenomenology can help us learn from the experiences of others. Perspectives on Medical Education, 8(2), 90–97. https://doi.org/10.1007/s40037-019-0509-2
Oke, A., & Onwuegbuzie, H. (2013). Outsourcing, subcontracting-in and radical innovativeness: The moderating effect of manufacturing strategy. Journal of Manufacturing Technology Management, 24(4), 511–535. https://doi.org/10.1108/17410381311327387
Palmatier, R. W., Dant, R. P., & Grewal, D. (2007). A Comparative Longitudinal Analysis of Theoretical Perspectives of Interorganizational Relationship Performance. Journal of Marketing, 71, 172–194.
Petty, N. J., Thomson, O. P., & Stew, G. (2012a). Ready for a paradigm shift? Part 1: Introducing the philosophy of qualitative research. Manual Therapy, 17(4), 267–274. https://doi.org/10.1016/j.math.2012.03.006
Petty, N. J., Thomson, O. P., & Stew, G. (2012b). Ready for a paradigm shift? Part 2: Introducing qualitative research methodologies and methods. Manual Therapy, 17(5), 378–384. https://doi.org/10.1016/j.math.2012.03.004
Polkinghorne, D. E. (2005). Language and meaning: Data collection in qualitative research. In Journal of Counseling Psychology (Vol. 52, Issue 2, pp. 137–145). https://doi.org/10.1037/0022-0167.52.2.137
Rivera-Gómez, H., Gharbi, A., Kenné, J. P., Montaño-Arango, O., & Hernandez-Gress, E. S. (2016). Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system. International Journal of Production Economics, 171, 134–150. https://doi.org/10.1016/j.ijpe.2015.10.008
Robertson, K. M., Jane, ufvca O., & Hannah, D. R. (2020). FINDING MEANING IN RELATIONSHIPS: THE IMPACT OF NETWORK TIES AND STRUCTURE ON THE MEANINGFULNESS OF WORK 1.
Siaw Khang, T., Arumugam, V., Yee-Loong Chong, A., & Chan, F. T. (2010). Malaysian service industry. In Int. J. Modelling in Operations Management (Vol. 1, Issue 1).
Sinha, A. K., Davich, T., & Krishnamurthy, A. (2016). Optimisation of production and subcontracting strategies. International Journal of Production Research, 54(8), 2377–2393. https://doi.org/10.1080/00207543.2015.1077285
Skinnarland, S. (2013). Use of Progression Planning Tools in Developing Collaborative Main contractor-Subcontractor Relationships in Norway.
Suyatno. (2010). Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung. 160. http://eprints.undip.ac.id/23968/1/SUYATNO.pdf
Tan, Y., Xue, B., & Cheung, Y. T. (2017). Relationships between Main contractors and Subcontractors and Their Impacts on Main contractor Competitiveness: An Empirical Study in Hong Kong. Journal of Construction Engineering and Management, 143(7), 05017007. https://doi.org/10.1061/(asce)co.1943-7862.0001311
Thi, H., Pham, H., & Hoang, H. T. (2018). The influence of digitalization on the buyer-supplier relationships in the construction industry.
Tserng, H. P., & Lin, P. H. (2002). An accelerated subcontracting and procuring model for construction projects. Automation in Construction, 11(1), 105–125. https://doi.org/10.1016/S0926-5805(01)00056-5
Ulubeyli, S., Kazaz, A., & Arslan, V. (2017). Uluslararası İnşaat Projelerinde Taşeron Seçimi İçin Karar Kriterleri. Nevşehir Bilim ve Teknoloji Dergisi, 6(December), 397–406. https://doi.org/10.17100/nevbiltek.321055
van Mieghem, J. A. (1999). Coordinating investment, production, and subcontracting. Management Science, 45(7), 954–971. https://doi.org/10.1287/mnsc.45.7.954
Webster, M., Muhlemann, A. P., & Alder, C. (2000). Decision support for the scheduling of subcontract manufacture. International Journal of Operations and Production Management, 20(10), 1218–1237. https://doi.org/10.1108/01443570010343753
Wilson, J. R., & Sharples, S. (2015). EVALUATION OF HUMAN WORK F O U RT H E D I T I O N.
Wood, G. D., & Ellis, R. C. T. (2005). Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), 317–325. https://doi.org/10.1080/0144619042000287714
Yousaf, Z., & Majid, A. (2018). Organizational network and strategic business performance: Does organizational flexibility and entrepreneurial orientation really matter? Journal of Organizational Change Management, 31(2), 268–285. https://doi.org/10.1108/JOCM-12-2016-0298
Published
How to Cite
Issue
Section
Citation Check
License
The copyright of the article fully belongs to the Jurnal Akuntansi dan Pajak and publishing rights belong entirely to LLPM STIE AAS SurakartaÂ
Â
This work is licensed under a Creative Commons Attribution 4.0 International License.